Current position:Home > IA News

India TEC Published MTCTE Notifications

The Telecommunication Engineering Centre (TEC) published MTCTE Notifications in the beginning of November, 2022. Please find below overview as regard.
1. Shifting of products from GCS Scheme to SCS Scheme under MTCTE
As subject, this notification confirms the shifting of General Certification Scheme (GCS) to Simplified Certification Scheme (SCS) for products as following table, effective from 1 January of 2023; according to TEC’s “TESTING & CERTIFICATION PROCEDURE”, SCS offers advantages such as lower fee and lead time.


S. No.

Product

MTCTE phase

1.

Cordless Phone

Phase-I

2.

Private Automatic Branch Exchange

Phase-I

3.

PON family of broadband Equipment

Phase-II

4.

Transmission Terminal Equipment (SDH and Multiplexing Equipment)

Phase-II

5.

Equipment Operating in 2.4GHz and 5GHz band

Phase-III

6.

LAN Switch

Phase-IV

7.

Router

Phase-IV


2. Further exemption of Energy Consumption Rating (ECR) parameter in PON ERs
TEC confirmed further exemption of ECR parameter for PON (Passive Optical Network) ERs (Essential Requirements) as below table.

S. No.

Parameter Name as per ER

Standard Name as per ER

Exemption status

1.

Automatic Laser Shut-Down (ALS)

or

Automatic Power Shut-Down (APSD)

ITU-T G.664.
IEC 60825.
Annex-A1

Self-declaration is acceptable

2.

ECR

TEC 74046
Annex-R

Exempted till

30 June of 2023

3.

Protocol Test for any PON interface

As per interface mentioned in PON ER

Exempted till

30 June of 2023

Should you have any question, please feel free to contact us:
Email: service@mrt-cert.com


MRT Technical Consultants at your service!

Online message

If you have any questions or suggestions, please leave us a message.

  • Company name:*

  • Name: *

  • Post: *

  • Mobile phone number: *

  • Email: *

  • Consultation content:

  • By submitting this form, you are voluntarily completing it and have read your consent 《Statement》 *